SIRS ON BIKES
Chairman: Jerry Butler
Alternate: Karl Reseck
Monthly
bicycling is a combined activity of Branch 35 and all branches in
Area 16. Rides are monthly on the 2nd Thursday of the month.
There is no ride
in December. Attendance, including guests and
wives, averages about 12 to 16 riders, but more are welcome.
The rides are
planned to be 15 to 20 miles on paved bicycle trails so that almost
any type bike is usable. Some rides have optional ride distances.
The pace is moderate and riding on streets is kept to a minimum. The
rides start at 11:00 AM and include a lunch break at a
restaurant.
Events are
announced in each branch’s monthly newsletter and by e-mail to all
interested members.
The list of rides for the year 2012 is:
|
January 12, 2012
|
Stevens Creek/Shoreline Park (Mt. View)
|
|
February 9, 2012
|
Coyote Creek (So. San Jose)
|
|
March 8, 2012
|
Coyote Hills – Alameda Creek (Fremont/Niles)
|
|
April 12 2012
|
Brisbane Bayshore Trail
|
|
May 10, 2012
|
Foster City Bay Trail
|
|
June 14, 2012
|
Mt View to Alviso
|
|
July 12, 2012
|
Coyote Creek (So. San Jose)
|
|
August 9, 2012
|
Stevens Creek/Shoreline Park (Mt. View)
|
|
September 13, 2012
|
Los Gatos Creek
|
|
October 11, 2012
|
Coyote Hills – Alameda Creek (Fremont/Niles)
|
|
November 8, 2012
|
Foster City Bay Trail
|
|
December
|
(No ride)
|

The
following are excerpts from the above ride announcements that provide
a brief description of each ride:
We
will ride the Coyote
Creek Trail
from the Holiday Inn, just north of the highway 101/85 interchange.
The ride is a flat 12 mile round trip, plus an optional 6-mile loop.
Lunch will at the Coyote Creek Golf Course.
We will ride
the rolling Los
Gatos Creek Trail
for about 7.5 miles from Blackford School to the town of Los Gatos
for lunch. Then ride back for a total of about 15 miles.
We
will ride the flat Foster
City Bay Trail
for about 10 miles from Marine Parkway to the Poplar Creek Golf Club
at Coyote Point for lunch. Then we ride back (approximately 20 miles
round trip).
The bike ride will be on the Stevens
Creek Trail
for a level 12-mile round trip to Shoreline Park with an optional
5-mile loop north to the Palo Alto Duck Pond. Lunch is planned at
Michaels Restaurant in Shoreline Park.
We will begin the ride
at the Coyote
Hills
Regional Park and continue on the Alameda
Creek Trail
where we have lunch in downtown Niles. After lunch we will ride back
for a total of about 18 flat miles, plus an optional scenic loop that
adds about 1 mile.
We
will ride the paved trail along the ocean shore from Poplar Beach
near Half
Moon Bay to Pillar Point
and then to Princeton where will have lunch. The total ride is 13
miles.
We
will ride the Brisbane
part of the Bay Trail near several marinas and office buildings along
the Bay Shore. We will stop at a point near the north boundary of
SFO, where we will have lunch, then return, for a total ride of 15
miles.
The
ride from Mountain
View to Alviso
will begin at the La Avenida Trial Head and follow the Stevens Creek
Trail for 1.5 miles where we connect with the Bay Trail. We continue
the ride 3.5 miles on the levees and old service roads as we cross
the waters north of Moffett Field. We then head for Sunnyvale
Baylands Park and follow the trial through the park and then to
downtown Alviso for lunch. The ride is 19 miles round trip.
We welcome your questions, comments or
suggestions. Please feel free to contact
us.
Note: If clicking the above link does not open a contact
window, please click here. |